Now showing items 1-10 of 11
Multi-objective optimal job shop scheduling under machine breakdowns
(International University - HCMC, 2015)
This paper describes the job shop scheduling of a wood factory under machine breakdowns. In this research, the multiple objective optimization was applied to Job shop Scheduling under machine breakdowns problem. Traditionally, ...
A genetic algorithm for single machine total weighted tardiness scheduling problem
(International University - HCMC, 2015)
This thesis research presents a genetic algorithm for the single machine scheduling problem with minimize total weighted tardiness, which is a strong NP-hard problem. This genetic algorithm uses the natural permutation ...
Optimization the production scheduling for assembling production system case study : Dong Nai battery
(International University - HCMC, 2015)
This thesis will be introduced about Storage Battery Joint Stock Company with business name PINACO and mentioned about flow shop scheduling and battery products in PINACO Company. In a research study for a battery manufacturing ...
Applying material requirement planning system for Saigon Garmex Company
(International University - HCMC, 2015)
Garmex Saigon Company has been suffered uncontrollable material requirement for years. Sixty percent of necessary material for production is imported from China, which lead to many problems for the company. The precise ...
Material requirement planning: A case study in LTD. Toan Bich
(International University - HCMC, 2015)
Material Requirement Planning (MRP) is a well known tool in manufacturing and been using worldwide but in Vietnamese company this tool is not common use. This thesis is about applying MRP in production in Toan Bich, a ...
Applying ergonomics for improving worker's motion: Case study of Siemens Vietnam
(International University - HCMC, 2015)
The thesis’ purpose is to reduce the injures/illness of the workers in an assembly line in incomplete-automatic working environment. This thesis is applying for Siemens Automation System and its workers. The ergonomics ...
Applying data mining for manufacturing cycle time prediction : A case study Scancom Vietnam Limited Company
(International University - HCMC, 2015)
Late delivery is considered as a big problem in Scancom Vietnam Limited Company. One of reasons effect on late delivery is that the production planning and the actual production are not consistent. The aim’s research is ...
Line balancing in textile production: A case study at Pungkook Company
(International University - HCMC, 2015)
In the assembly line balancing problem, there are two main objectives. That is to minimize the number of workstations for a given cycle time (SALBP type-1) and minimize cycle time given a number of workstation (SALBP ...
A fuzzy goal programming for aggregate production planning: A case study in A Dong Paint Company
(International University - HCMC, 2015)
The paper proposed the new fuzzy goal programming (FGP) for solving aggregate production planning (APP) problem to support decision makers handle goal values in case that are unable to form crisp numbers. In practice, most ...
The optimization of distribution network: A case study of KUEHNE + NAGEL Viet Nam
(International University - HCMC, 2015)
The location of distribution center and the vehicle routing from that location is an important strategic decision in distribution network design, in general as it relates to service level quality, profitability and ...