• Login
    View Item 
    •   Home
    • HCMIU Thesis
    • Industrial and Systems Engineering
    • Bachelor Thesis - Industrial and Systems Engineering
    • View Item
    •   Home
    • HCMIU Thesis
    • Industrial and Systems Engineering
    • Bachelor Thesis - Industrial and Systems Engineering
    • View Item
    JavaScript is disabled for your browser. Some features of this site may not work without it.

    Resource scheduling of jobshop system with time constraint: A case study of ABC company

    Thumbnail
    View/Open
    022005783 - Thuong, Ngo Ngoc Nhat.pdf (1.768Mb)
    Date
    2020
    Author
    Thuong, Ngo Ngoc Nhat
    Metadata
    Show full item record
    Abstract
    In recent decades, industry, especially manufacturing, has become a crucial factor for the economy in Viet Nam, so production using flexible resources to reduce total production time has become one of the most significant issues by many enterprise managers. As a result, in this thesis research, the main objective is to arrange the proper number of machines in the reworked line to finish a fixed number of products in a limited total completion time Besides, the scope of this thesis will have six parts with collecting and researching essential information from lessons, books, and some reference research journals. Firstly, the Introduction section, which shows the reason why I choose to study this topic by presenting a platform for this study and a problem statement of a particular company. Next, the literature review and some related journals will be referred to in the Related Works part, and then, the Methodology stage will review some considerable approaches and the data collections and analysis. Thirdly, in the Modelling stage, the mathematical model will be presented, and after applying a programming language, I will find the optimal solution. In the Result part, a result of the experiment will be compared with the current process. Finally, in the conclusion part, the summary of the thesis will discuss with the main result, which gives some advice for this case study and analyze the environmental, social, and economic impacts of this research result. All to all, this thesis is not only a significant method to learn more clearly about my major but also a chance to practice specialized skills for the future job. Keyword: Job-shop system, resource scheduling, resource constraint, linear programming, limited total completion time
    URI
    http://keep.hcmiu.edu.vn:8080/handle/123456789/4072
    Collections
    • Bachelor Thesis - Industrial and Systems Engineering
    Opening hours

    Mon-Fri: 8:00 am - 5:30 pm

    Sat: 8:00 am - 4:00 pm

    Stay connected

    Library Home

    Online Resources

    Feedback Corner

    VNU Central Library

    International University

    Home

    Schools/Departments

    Thesis List

    Edusoftweb

    Contact

    Phone: 028 3724 4270 - 3947

    Email: LibQuest@hcmiu.edu.vn

    Ward 6, Linh Trung, Thu Duc, HCMC

    Browse

    All of DSpaceCommunities & CollectionsBy Issue DateAuthorsTitlesSubjectsThis CollectionBy Issue DateAuthorsTitlesSubjects
    Opening hours

    Mon-Fri: 8:00 am - 5:30 pm

    Sat: 8:00 am - 4:00 pm

    Stay connected

    Library Home

    Online Resources

    Feedback Corner

    VNU Central Library

    International University

    Home

    Schools/Departments

    Thesis List

    Edusoftweb

    Contact

    Phone: 028 3724 4270 - 3947

    Email: LibQuest@hcmiu.edu.vn

    Ward 6, Linh Trung, Thu Duc, HCMC