Reservation with slack in scheduling by heuristics algorithm
(International University - HCMC, 2019)
Many researches have illustrated the importance of planning and scheduling in many stages within production lines, as well as the flexibility when including slack time in processing stages. Meanwhile in some smaller-scale ...
Flow shop scheduling problem: Gray wolf optimization algorithm (GWO)- A case study of scancom VietNam
(International University - HCMC, 2019)
Flow shop scheduling problems have important applications in manufacturing. The flow shop scheduling problem seeks to minimize the makespan, improve the efficiency of delivery system and hence raise the customers’ satisfactory. ...
Apply ergonomics in materials handling system: Case study ScanCom company
(International University - HCMC, 2019)
Ergonomic is the scientific discipline that concentrates on human beings, interactions among people, machines. Human factors aims to ensure that the information, tasks, equipment and the environment fit each worker. It ...
Vehicle routing problem with time windows: A case study of Nguyen Tan company
(International University - HCMC, 2019)
Vehicle routing problem with time windows (VRPTW) is an extension of vehicle routing problem (VRP). It will minimize total cost or total travel distance while still satisfy those constraints such as capacity and time ...
Adaptive particle swarm optimization for integrated quay crane and yard truck scheduling problem
(International University - HCMC, 2019)
This thesis tackles the integrated Quay Crane and Yard Truck scheduling problem at container terminal, considering practical conditions as well as specific requirements of Cat Lai Terminal. In particular, the study takes ...
Aggregate production planning for manufacturing system: A case study of Makita company
(International University - HCMC, 2019)
Production planning is one of the most important functions in the process of production management. Production planning in the intermediate range of time is termed as “aggregate production planning (APP)”. Aggregate ...
Improving installing time for new machine by lean application: A real case study in Intel VNAT
(International University - HCMC, 2019)
Viet Nam Assembly and Test (VNAT) factory started to produce chipset products for Intel Global since 2010. Currently, VNAT is considered as a ramp up site delivering 70% finish-good across a virtual factory of Intel over ...
Heterogeneous fleet vehicle routing problem with window: A case study in DKSH Vietnam
(International University - HCMC, 2019)
In this thesis, a Healthcare Business Unit of a company suffers from a transportation problem which is then suggested to solve by vehicle routing. Regarding the company characteristic, the problem is classified as the ...
Parallel machines scheduling problem with sequence dependent set up times: A case of Bosch Vietnam
(International University - HCMC, 2019)
Unrelated parallel machines with sequence-dependent set-up time is studied in this thesis with the case of Bosch Vietnam. The aim of this study is to improve the effectiveness of production system by shortening the maximum ...
The vehicle routing problem with time windows for perishable food delivery in Ho Chi Minh city
(International University - HCMC, 2019)
Vehicle Routing Problem with Time Window (VRPTW) has been becoming one of the major
considerations for enterprises in today’s competitive economy in which on-time and cost-effective
delivery is a must. This study has ...