Show simple item record

dc.contributor.advisorTran, Van Ly
dc.contributor.authorLe, Quang Khoi
dc.date.accessioned2024-03-26T08:50:09Z
dc.date.available2024-03-26T08:50:09Z
dc.date.issued2023
dc.identifier.urihttp://keep.hcmiu.edu.vn:8080/handle/123456789/5416
dc.description.abstractIn this case study, a simulation model of a warehouse operation of PEACE AGE MEDICAL EQUIPMENT CO., LTD (PEACE AGE) is analyzed and developed on Arena Simulation Software. The current process of input and output of product warehouse is investigated to analyze and develop the system. The expected result is the understanding of warehouse performance and efficiency, issues that exist inside the system are pointed out and researchers will propose some suggestions to improve the overall operation. Alternative improvement scenarios are presented to show that the changes in some factors of the operation could improve the overall performance.en_US
dc.language.isoenen_US
dc.subjectwarehouse operationen_US
dc.subjectsimulationen_US
dc.subjectARENAen_US
dc.titleAnalysis And Improvement The Operation Of Peace Age Medical Equipment Co., Ltd Warehouse By Simulation Softwareen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record