Structural Design Of Pk3 Vinhomes Grand Park, Phuoc Thien Street, Long My Ward, Thu Duc City, HCM City
Abstract
In tall building thesis project, main objectives are places with high investment
for living and developing in long term. The design details of the structure such as
floors, beams, walls, foundations are treated in detail and clearly for the purpose of
describing the process in the design steps. Architectural drawings are first developed
to generalize the model until the final step is to create detailed drawings for each
structure. Including slab, beam, shear wall and foundation.
The methods used in the special topics of this project are to point out the
difference and offer many suitable and highly effective construction options. For
instance, wind force will be calculated according to both EN-1991 (Euro code), slab
design will be carried out in form of solid slab, wall design which will also be
computed in 3 specific methods which are edge method, pressure division and
interaction diagram method. The final is foundation that will be divided into type of
methods: compressed pile, bored (drilled) pile individual’s advantages and
disadvantages.
In addition to the design report, we have drawings that show the design details
in the file. The drawings from architecture, frame design, foundation is all built and
drawn on Autocad and Revit software