Show simple item record

dc.contributor.advisorPhan, Nguyen Ky Phuc
dc.contributor.authorPham, Dang Khoa
dc.date.accessioned2024-03-26T03:49:56Z
dc.date.available2024-03-26T03:49:56Z
dc.date.issued2023
dc.identifier.urihttp://keep.hcmiu.edu.vn:8080/handle/123456789/5332
dc.description.abstractIn this research paper, we tackle the Hybrid Flowshop Scheduling Problem with Demand Variation (HFSP-DV), a challenging problem in production scheduling. We develop a mixed integer programming model tailored specifically for the HFSP-DV and propose a Genetic Algorithm (GA) approach to solve it. Through extensive computer tests on smallscale examples, we evaluate the performance of our proposed GA method and compare it with the benchmark solver CPLEX. We further apply the proposed GA method to a realworld case study of the HFSP-DV, validating its practical applicability. Our research contributes to scheduling optimization by addressing the HFSP-DV and providing effective approaches for managing demand variations, offering practical benefits for industries facing dynamic demand patterns.en_US
dc.language.isoenen_US
dc.subjectHybrid Flow shop Scheduling Problem with Demand varyingen_US
dc.subjectProduction Schedulingen_US
dc.subjectFlow shop Schedulingen_US
dc.subjectGenetic Algorithmen_US
dc.subjectMixed integer programmingen_US
dc.titleSolving A Hybrid And Flexible Flow Shop Scheduling Problem With Time-Varying Demand For Fmcg Industry: A Case Of Unilever Vietnamen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record