Show simple item record

dc.contributor.authorThanh, Nguyen Tan
dc.date.accessioned2015-02-13T04:25:11Z
dc.date.accessioned2018-05-16T04:04:27Z
dc.date.available2015-02-13T04:25:11Z
dc.date.available2018-05-16T04:04:27Z
dc.date.issued2014
dc.identifier.urihttp://10.8.20.7:8080/xmlui/handle/123456789/1273
dc.description.abstractThe purpose of paper is improving efficiency KPI in shoes production companies. A case study of Adidas Vietnam was adopted. The aim of this paper is improving the KPI efficiency that related to the working time, number of worker existing on production line and productivity (output). Two phases for improvement were generated, the first one is Improving the cycle time to be below takt time and keeping number of workstation using direct observation method base on concept of eliminating, combining, simplifying the assembly process without any additional machine and manpower and Arena software. Next phase is modifying the initial improvement to generates the second improvement by minimize number of workstation. Lingo software is used for that purpose. All the required data was measured and the parameters such as elapsed time at each work station, efficiencies, number of workers, time of each of the workstations etc. was calculated from the existing line. Keywords: Efficiency, Line balancing, Simulation process design, Optimization, Minimize workstation, Lingo.en_US
dc.description.sponsorshipDr. Pham Huynh Tramen_US
dc.language.isoen_USen_US
dc.publisherInternational University HCMC, Vietnamen_US
dc.relation.ispartofseries;022001861
dc.subjectProduction - Improvement methodsen_US
dc.titleImprovement of efficiency for production line by applying line balancing and simulation: A case study in Adidas Companyen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record