Show simple item record

dc.contributor.advisorHuy, Nguyen Hoang
dc.contributor.authorBao, Bui Thien
dc.date.accessioned2019-01-26T07:28:52Z
dc.date.available2019-01-26T07:28:52Z
dc.date.issued2017
dc.identifier.other022003974
dc.identifier.urihttp://keep.hcmiu.edu.vn:8080/handle/123456789/3086
dc.description.abstractIn this paper, a goal programming model was applied to find solution in order to control the total profit, inventory level, workforce level, overtime hours and repairing cost with different operational constraints including inventory level, workforce level, and production capacity. The three goal objectives of model are maximization the total profit, minimization the repairing cost and minimization the labor overtime. A set of data collection from SC factory is utilized to test the usefulness, robustness and flexibility of the proposed model. By using IBM ILOG CPLEX Optimization Studio software, the proposed model was solved. In the results, the managers can find the solution for the company by adjusting the goal priorities. Keywords: Aggregate Production Planning, Goal Programming, IBM ILOG CPLEX Optimization Studio software.en_US
dc.language.isoen_USen_US
dc.publisherInternational University - HCMCen_US
dc.subjectAggregate production planning; Goal programmingen_US
dc.titleAggregate planning in production system: A case study for SC factory of hyosung company Vietnamen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record