Show simple item record

dc.contributor.advisorPhuc, Phan Nguyen Ky
dc.contributor.authorNhan, Le Cat
dc.date.accessioned2021-08-23T03:38:08Z
dc.date.available2021-08-23T03:38:08Z
dc.date.issued2020
dc.identifier.other022005740
dc.identifier.urihttp://keep.hcmiu.edu.vn:8080/handle/123456789/4060
dc.description.abstractThe aim of this study is to reduce the waiting time in each workstation and minimize the completion time of entire production system simultaneously. Based on identical parallel machines and workstation revisiting problem of Wanek Furniture company whose factory is confronted with large production orders, this thesis would like to focus on the flow shop scheduling of production in furniture factory. In order to do that, this paper investigates the optimal way of splitting job formulated as a Linear Programming model which is evaluated by a real situation of company. In addition to objective, many constraints were considered to apply. Our model can be applied in furniture field, especially suitable for industry or company which products are manufactured in flow shop scheduling. Keywords: minimizing makespan, job-splitting, identical parallel machines, workstation revisiting.en_US
dc.language.isoen_USen_US
dc.publisherInternational University - HCMCen_US
dc.subjectParallel machinesen_US
dc.titleIdentical parallel machines and revisting workstations with splitting job in flow shopen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record