Show simple item record

dc.contributor.advisorNguyen, Van Hop
dc.contributor.authorThai, Tri Nhan
dc.date.accessioned2024-03-13T08:37:40Z
dc.date.available2024-03-13T08:37:40Z
dc.date.issued2020-08
dc.identifier.urihttp://keep.hcmiu.edu.vn:8080/handle/123456789/4434
dc.description.abstractThe integrated Quay Crane, Yard Truck and Yard Crane scheduling problem is a very important problem at container terminals that has considerable impact on world’s port operation as it tackles the optimization and synchronization of all major operations and scheduling of port equipment. This thesis will take into account the integrated container unloading process and a case study of Tan Cang – Cat Lai Terminal to solve the according scheduling problem with the purpose of minimizing the maximum completion time. The problem is formulated and benchmarked with Cplex program in small-sized problems. In addition, a meta-heuristic called Grey Wolf Optimizer (GWO) is implemented based on the algorithm’s discrete version. Data sets collected from the case study will be used to execute the coding under GWO approach through Matlab R2019a, the outcome of which is then benchmarked with the former method to evaluate their performance. The results indicate that both methods produce good solutions to the problem while maintaining their own distinct advantages. GWO algorithm can be applied well to big-sized problems since Cplex is able to handle problems with such precision in preferred small-size instances in particular.en_US
dc.language.isoenen_US
dc.subjectIntegrated quay craneen_US
dc.titleAn Integrated Quay Crane, Yard Truck And Yard Crane Scheduling Problem: A Case Study Of Tan Cang-Cat Lai Terminalen_US
dc.typeThesisen_US


Files in this item

Thumbnail

This item appears in the following Collection(s)

Show simple item record