MRP optimization model for a production system: A case study of Japan paper technology (VN) Co., LTD
Abstract
Nowadays, some companies still have frequent delays in orders, the main reason
is not providing materials in time, the coordination of information between
departments is very slow, especially updated information about current materials. The
location of the factory and the situation of incoming orders make the department
confused in planning production and supplying materials. In addition, production
planning is mainly based on the experience of long-term employees, often mistakes
and corrections occur, this is suitable when orders are small, when orders are high,
such planning is no longer suitable, there is often a disturbance of orders that have not
been completed by the delivery date, and those that have reached the delivery date are
not completed, leading to order delay, which requires a system in which there is
coordination between the supply, sales and production departments to make the most
of the factory resources, provide timely materials for production, calculate the time
reasonable delivery, satisfy customer’s demand. That system is Manufactuting
Resource Planning (MRP II). In this paper, we develop an optimization model for a
manufacturing system's MRP II. IBM ILOG CPLEX Optimization Studio is used to
solve the model.