dc.description.abstract | The subject of integrated production planning and scheduling at the job- shop with specified
times and batches is addressed in this thesis. It takes into account not just setup costs, workin-progress, product demand, and equipment volume, but also specific scheduling
limitations. It differs from the standard hierarchical production planning system, which does
not account for particular scheduling limitations, making a practical production plan
impossible to ensure. A model and precise scheduling restrictions are used to test and resolve
a feasible production plan in order to maximize production planning and schedule at the
same time. The program Cplex version 12.9 is used to diagnose and resolve the issue. The
results indicate that the model has to be adjusted and tested further in order to get the best
outcomes. | en_US |